{"id":11227,"date":"2026-07-16T04:22:17","date_gmt":"2026-07-16T04:22:17","guid":{"rendered":"https:\/\/stock999.top\/?p=11227"},"modified":"2026-07-16T04:22:17","modified_gmt":"2026-07-16T04:22:17","slug":"giant-data-centres-get-the-first-green-light-from-cape-town-tribunal","status":"publish","type":"post","link":"https:\/\/stock999.top\/?p=11227","title":{"rendered":"Giant data centres get the first green light from Cape Town tribunal"},"content":{"rendered":"<p><\/p>\n<p>An application that paves the way for two new data centres totalling more than 120 000m\u00b2 in Cape Town\u2019s airport industrial area has been approved by the Municipal Planning Tribunal.<\/p>\n<p>The land use, subdivision and consolidation application by King David Country Club, which owns the area known as King Air Industria, makes no mention of how much water the giant data centres will use, nor does it detail energy supply and demand.<\/p>\n<p>Read\/listen:<\/p>\n<p>Africa\u2019s data centre gold rush needs a reality check<br \/>\nBuilding South Africa\u2019s digital future: Infrastructure, skills, and the AI opportunity<\/p>\n<p>The lack of information on this, and on backup diesel generation, fuel storage, air pollution, noise and related health impacts formed the basis for opposition to the application by Cape Town-based social movement, Housing Assembly, and UK-based tech justice non-profit organisation Foxglove, which received advice from the Legal Resource Centre (LRC).<\/p>\n<p>Presenting to the tribunal on Tuesday, LRC attorney Kimal Harvey said their research revealed that for every megawatt (MW) of electricity needed, a data centre using traditional cooling techniques used about 25.5 million litres of water per year.<\/p>\n<p>The proposed data centres at King Air Industria, to be built by American multinational company Equinix, would have an electrical demand of about 174MW. This equated to about 4.4 billion litres of water per year.<\/p>\n<p>This amount of electricity could power about 130 000 homes.<\/p>\n<p>The lack of this information in the land use application was a \u201ccritical\u201d gap, stated Foxglove in its press release, and was \u201cparticularly troubling\u201d.<\/p>\n<p>ADVERTISEMENT<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<p>Harvey said Housing Assembly had pointed out that Cape Town had suffered serious historic problems with water scarcity, \u201cwith their members literally watching taps run dry during the \u2018Day Zero\u2019 crisis in the previous decade\u201d.<\/p>\n<p>\u201cThe failure of Equinix to provide any kind of substantive detail on the new data centre\u2019s water consumption in [its] land use application not only renders it impossible for it to be properly considered by the City of Cape Town, but is also arguably a serious insult to everyone who has suffered through this water scarcity in the recent past.\u201d<\/p>\n<p>Read:<\/p>\n<p>What Cape Town can do to save water<br \/>\nCape Town\u2019s water use remains too high despite Day Zero lessons<br \/>\nCape Town goes private to boost electricity and water supply<\/p>\n<p>The application by King David Country Club involves three erven, two of which are zoned as General Industry, and one as Mixed Use.<\/p>\n<p>The landowner sought to have all three zoned as General Industry in order to have the zoning uniformity required by Equinix. The application also sought to consolidate the three erven into one, and amend the condition of approval granted in 2019 restricting floor space to less than 300 000m\u00b2.<\/p>\n<p>A small land swap with the city, involving a substation, is also part of the application.<\/p>\n<p>Harvey argued the application was mischaracterised as \u201conly a technical change\u201d to the land use rights.<\/p>\n<p>He said a data centre was defined within the Municipal Planning Amendment By-law as \u201ca building or dedicated space within a building or a group of buildings used to store computer systems and associated components, such as telecommunication and storage systems\u201d. But this definition was only created in the amendment in 2025, before the original application.<\/p>\n<p>ADVERTISEMENT:<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<p>\u201cTherefore, the inclusion of data centres in the definitions for business premises and warehouses cannot be retrospectively applied\u201d, and a new application was necessary, he argued.<\/p>\n<p>The mischaracterisation also existed in the applicant\u2019s minimisation of the impact a data centre has on the surrounding areas and communities, which related to its electricity and water usage.<\/p>\n<p>Read:<\/p>\n<p>Cape Town housing activists celebrate landmark Tafelberg court victory<br \/>\nPinelands groups oppose Cape Town plan for 116-year-old golf course<br \/>\nCape Town needs rational thinking on appropriate land use<\/p>\n<p>Tribunal member Wally Johnstone agreed that the current definition for a data centre was \u201cwholly inadequate\u201d and \u201csimplistic\u201d, and there was no recognition that there was a significant change to the use of the land.<\/p>\n<p>Johnstone said Cape Town\u2019s water systems were under pressure, and noted a recent march in Khayelitsha over lack of access to water.<\/p>\n<p>\u201cThe concern is real and should not be ignored.\u201d<\/p>\n<p>He said the lack of greenhouse gas emission figures was also a concern, particularly given the impact of global heating on Cape Town\u2019s water future, and high electricity use was a concern given recent load shedding and the impact on grid stability.<\/p>\n<p>ADVERTISEMENT:<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<p>\u201cI\u2019m obliged to conclude most of us don\u2019t know what is required in terms of water and electricity demand in an application we\u2019re asked to approve,\u201d he said, adding that the lack of information meant he was unable to support the application.<\/p>\n<p>However, the other four Tribunal members, including chair Sydney Holden, were of the view that details on water and electricity demand, along with other concerns, would be addressed in the Site Development Plan, which would still need to be approved.<\/p>\n<p>They were in general agreement with the applicant that this was merely a technical amendment to the land use rights.<\/p>\n<p>In granting the application, Holden said a data centre would promote the city \u201cas a global, competitive, and innovation-driven hub\u201d, create downstream employment and contribute to \u201cimproved digital infrastructure\u201d serving a variety of industries.<\/p>\n<p>He said the site development plan would have to be closely scrutinised, as well as the building plan, should the site development plan be approved.<\/p>\n<p>\u00a9 2026 GroundUp. This article was first published here.<\/p>\n<p>                        #Giant #data #centres #green #light #Cape #Town #tribunal<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An application that paves the way for two new data centres totalling more than 120&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[2798,2611,569,1356,5361,1225,2799,5360],"_links":{"self":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts\/11227"}],"collection":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11227"}],"version-history":[{"count":0,"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts\/11227\/revisions"}],"wp:attachment":[{"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}