{"id":16440,"date":"2026-09-19T02:49:21","date_gmt":"2026-09-19T02:49:21","guid":{"rendered":"https:\/\/stock999.top\/?p=16440"},"modified":"2026-09-19T02:49:21","modified_gmt":"2026-09-19T02:49:21","slug":"ais-existential-fears-meet-wall-street-financing-fomo-in-europe","status":"publish","type":"post","link":"https:\/\/stock999.top\/?p=16440","title":{"rendered":"AI\u2019s existential fears meet Wall Street financing Fomo in Europe"},"content":{"rendered":"<p><\/p>\n<p>JPMorgan Chase &amp; Co and Goldman Sachs Group are among banks lining up to finance billions of dollars in European AI debt as the region races to close the gap with the US.<\/p>\n<p>The Wall Street underwriters are vying for a leading role in financing Europe\u2019s push to reduce its reliance on overseas technology. Both have assembled specialist teams to pitch deals to data-centre operators and investors.<\/p>\n<p>\u201cThere hasn\u2019t been a great deal of issuance here but there has been intense investor focus,\u201d said Noah Roth, JPMorgan\u2019s London-based head of EMEA leveraged finance. \u201cThere\u2019s a lot of Fomo.\u201d<\/p>\n<p>Investors may not have to miss out much longer. Anywhere from $5 billion to $10 billion of data-centre bonds could reach European markets by the end of the year, with a much bigger wave expected in 2027, according to Goldman Sachs estimates.<\/p>\n<p>By contrast, the US has already seen more than $350 billion in AI-related issuance so far this year, according to data compiled by Bloomberg. AI executives there are warning of catastrophic risks from their most advanced models and states including Texas and New York are restricting new data centres.<\/p>\n<p>Europe, meanwhile, is worried about not building fast enough. European Central Bank President Christine Lagarde has warned that relying on US technology risks giving Europe\u2019s trading partners enormous leverage.<\/p>\n<p>\u201cRegardless of whether or not we have a European champion in AI, Europe will need to have data centers, for European security and for data sovereignty,\u201d said Giacomo Reali, a leveraged finance partner at Linklaters.<\/p>\n<p>ADVERTISEMENT<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<p>Closing the gap won\u2019t come cheap. Europe may need about $3 trillion through 2035 to fund cloud infrastructure, data centres and other critical technologies, according to Bloomberg Intelligence.<\/p>\n<p>Until now, banks, project finance and securitisationswere enough for Europe\u2019s smaller-scale projects. The next generation will require deeper pools of capital. Among them: Start Campus, a planned 1.2-gigawatt facility in Portugal.<\/p>\n<p>Projects of that size will pave the way for a bigger role for both investment-grade and high-yield debt markets. AI-related debt represents about 5% of European high-yield issuance, versus 19% in the US, according to Dealogic and Goldman Sachs research.<\/p>\n<p>Each new 100 to 200 megawatt centre in Europe could translate to \u201c$1 billion, $2 billion debt deals at a minimum,\u201d Miriam Wheeler, global head of leveraged finance at Goldman Sachs, said on the sidelines of her bank\u2019s leveraged finance conference in London. She estimates Europe\u2019s role in the global AI build-out could rise to as much as 25% from 10%.<\/p>\n<p>\u201cWe think if you start seeing more of that mega capex come to Europe, then you\u2019ll start to see it financed in the 144A market, investment-grade and non-investment grade,\u201d she said.<\/p>\n<p>The first European high-yield data-centre deals are likely to borrow heavily from the US playbook. Cahill Gordon &amp; Reindel partner Ariel Goldman expects issuers to take the \u201ccleanest, easiest path\u201d to establish a track record before more customised structures.<\/p>\n<p>Before that can happen, a large amount of lender education will be needed to bring investors up to speed with the risks of committing to projects that have yet to be built. Data centres\u2019 heavy consumption of electricity and water is drawing greater scrutiny from lenders with ESG mandates. Even if investors don\u2019t want to be left behind in the AI wave, they aren\u2019t prepared to finance every project.<\/p>\n<p>ADVERTISEMENT:<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<p>The sole data center bonds priced in Europe\u2019s junk bond market, from CoreWeave, have been trading below their face value since news emerged that key client Meta Platforms Inc. was developing a competing cloud-infrastructure business.<\/p>\n<p>\u201cThe threshold and diligence we need to do is quite high,\u201d said Sid Chhabra, head of securitised credit, CLO management and euro high yield at RBC BlueBay.<\/p>\n<p>European investors spent much of the summer doing their homework. In July, some made the hour-long trip from London to Slough to tour data centres owned by Equinix. It was an unusual amount of effort for a \u00a3280 million ($377 million) bond deal.<\/p>\n<p>The turnout said something about the scarcity of AI-related debt in Europe. Equinix\u2019s asset-backed securities offering is tiny compared with the trillions of dollars needed to finance the global build-out of artificial intelligence infrastructure.<\/p>\n<p>But for the daytrippers to Slough, the data-centre deal was an early opportunity to get in on the AI boom. Orders for Equinix\u2019s bonds ended up totalling over \u00a3510 million.<\/p>\n<p>\u201cWe will see companies in the sector ultimately needing to raise billions from the market,\u201d said Ben Thompson, head of EMEA leveraged finance capital markets at JPMorgan. \u201cWe will see how big that number can be.\u201d<\/p>\n<p>\u00a9 2026 Bloomberg<\/p>\n<p>                        #AIs #existential #fears #meet #Wall #Street #financing #Fomo #Europe<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JPMorgan Chase &amp; Co and Goldman Sachs Group are among banks lining up to finance&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[1349,1381,20801,1153,5994,11214,2316,2807,2806],"_links":{"self":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts\/16440"}],"collection":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16440"}],"version-history":[{"count":0,"href":"https:\/\/stock999.top\/index.php?rest_route=\/wp\/v2\/posts\/16440\/revisions"}],"wp:attachment":[{"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stock999.top\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}